* Sino-Italy Cooperative project titled Agricultural Residues Gasification or Comprehensive Utilization,Convention ENEA-MAE (No. 944) dated on December 19th,
1995, as a result of the cooperation, two sets of biomass gasification for power system
have been provided by Italian government and installed at the experimental area , which are
30kW fixed bed biomass gasification for power system and 160kW
internally circulating fluidized bed biomass gasification for power system.

160kW CFB Gasification for Power System 30kW Fixed Bed Gasification for Power System National “Ninth-Five” Key Technologies Research and Development Programme: Fixed Bed Biomass Gasification for Gas Supplying System,No. 96-A17-02-01-01
National “863” Programme: 4MW Biomass Gasification for Power System, in this project, we undertook the task of setting up the data acquisition system for the plant, No. 2001AA514010
National “Tenth-Five” Key Technologies Research and Development Programme: 50kW Biomass Gasification for Power System. No. 2001BA403B0305 National “Ninth-Five” Key Technologies Research and Development Programme: Biomass Briquetting Technology and the Equipment, No. 96-A17-02-01-02 National Innovation Funds for Small and Mid-Sized Science and Technology Enterprises: Biomass Palletizing Technology and Equipment, No. 05C26210210327
Key Technologies Research and Development Programme(JH2): 200kW Biomass Gasification for Power System,l Innovation Funds for Small and Mid-Sized Science and Technology Enterprises: Biomass Palletizing Technology and Equipment